"The best laid plans of mice and men gang aft a-gley" (Robert Burns)
The best system design is only as good as the installation. Pre-construction site meetings help ensure everyone involved in the construction of a mechanical system or installation of a ground heat exchanger (GHX) has a complete understanding of the importance of their work.
Drawings, specifications and testing protocols describing quality control measures to be followed during construction are important for contractors building a mechanical system and GHX for a facility. Site inspections of the GHX and mechanical system during construction are required for accountability and for a quality installation.
Ensuring that equipment, controls and systems are working as intended after completion of a project is equally important to ensure our clients achieve the energy cost savings that are expected and that long term maintenance costs are minimized.